Our Project

Using advanced technical solutions to carry out projects that lead to system optimization and improvement.

Mansourabad Complex

Engineering, purchasing and installation of the control system for the Mansourabad Oil Complex

Upgrading the control system of Mansourabad Complex from pneumatic system to PLC control system

Pazanan Complex

Engineering, purchasing and installation of waste water pumps control system for Pazanan Complex

Upgrading the control system of wastewater pumps of the desalination unit of the Pazanan Complex from a contactor relay system to a PLC control system

Wellhead Control Panel

Engineering, installation and commissioning of Wellhead Control Panel(WHCP)

Engineering, installation and commissioning of the Wellhead Control Panel (WHCP) system to enhance the safety of oil wells and ensure their continued automated operation

Cloud Migration Platform

Installation and implementation of the monitoring system of the Pazanan complex

Programming the control system and installing precision instrumentation equipment to measure pressure difference for the gas line liquid tanks of the Pazanan factory

Cloud Migration Platform

Supply, installation and commissioning of process CCTV camera systems

Supply, installation and commissioning of CCTV cameras for the Nargesi gas pressure boosting and injection plant and the 1300 Siahmakan gas and liquefied gas plant

Cloud Migration Platform

Specialized repairs of fault finding devices, high voltage cable routing devices

Supply of parts and repair of electronic board cables, high voltage cable fault finding devices (PFL 1000/4000) and Seba daytronics high voltage cable route finding devices